Reservoir transportation and installation (Liebherr)

On October 1 2015 our company received a technical assignment from OOO Model company from the Kazakova line operation dispatcher station in Koshki village in the Samara region. Modul ordered the transportation and installation of two reservoirs (length: 22 m, height: 4,07 m , mass: 50 t)

10 November 2015
Installation of the boiler pipe at the Baltika plant

In summer 2015 our company received a technical assignment from one of our contractors at the Baltika plant to install a boiler pipe (length – 24 m, weight – 15 m).

9 November 2015
Participation in the construction of 8 oil reservoirs with a capacity of 20 000 m3 at the Transneft-Privolga line operations dispatcher station in 2015

In February 2015 our company faced a challenging task from one of our main contractors from Transneft: we were to continuously provide specialized equipment during the construction of 8 reservoirs with a capacity of 20 000 m3 each during 8 months.

9 November 2015
Construction of plants for Taneko Tatneft oil refinery (Nizhnekamsk)

BTS took part in the construction of an oil collection point in Nizhnekamsk where the major pipeline was commissioned at the AO Transneft facility at the oil metering point. The company also participated in the construction of metal structures at the plant itself being engaged by KamGesFundamentStroy company from Naberezhnye Chelny, republic of Tatarstan.

10 August 2015
The construction of the Baltic pipeline system-2 by passing Ukraine, Belorussia and Baltic countries

In 2010-2012 the company took part in a very important project that involved the construction of the Baltic pipeline system 2 by-passing Ukraine, Belorussia and Baltic countries.

9 August 2015